Kalkulator Životnog Ciklusa Troška (LCC)

Izračunajte ukupne troškove vlasništva uključujući nabavku, energiju, održavanje, zastoj i zbrinjavanje — svi diskontovani na sadašnju vrijednost tokom cijelog vijeka opreme.

Diskontovanje NPV Ukupni troškovi vlasništva EUR / USD / GBP
Brze unaprijed postavljene vrijednosti

Rezultati

Ukupna Cijena Životnog Ciklusa (LCC)
—
Nabavka + Instalacija
—
Udio Nabavke
—
NPV Operativnih Troškova
—
Operativni Udio
—
Godišnja Ekvivalentna Cijena
—
NPV Odlaganja
—

Formula Cijene Životnog Ciklusa

Ukupna cijena životnog ciklusa (LCC) uključuje sve troškove tijekom korisnog vijeka trajanja opreme, diskontovane na sadašnju vrijednost:

Gdje je Cgodišnji = energija + održavanje + zastoji, zbrojeni tokom n godina sa diskontnom stopom r.

NPV Godišnjih Troškova (Faktor Anuiteta)

Kada su godišnji troškovi konstantni, NPV se izračunava koristeći faktor sadašnje vrijednosti anuiteta:

Godišnja Ekvivalentna Cijena

Godišnja ekvivalentna cijena (AEC) raspodjeljuje ukupnu LCC ravnomjerno tijekom vijeka trajanja opreme:

Tipičan Pregled Troškova

OpremaNabavkaEnergijaOdržavanjeOstalo
Industrijska pumpa5–15%70–85%5–15%1–5%
Elektromotor1–5%90–97%1–3%<1%
Kompresor10–20%60–75%10–15%2–5%
HVAC sistem15–25%50–65%10–20%5–10%

Praktični primjer

Primjer — Industrijska Pumpa

Zadano: Nabavka = €5.000, Instalacija = €1.000, Energija = €500/god., Održavanje = €300/god., Vijek trajanja = 15 godina, Diskontna stopa = 5%

Cgodišnji = 500 + 300 = €800/god.

Faktor anuiteta = (1 – (1,05)–15) / 0.05 = 10.3797

NPV rada = 800 × 10,3797 = €8,304

LCC = 5.000 + 1.000 + 8.304 = €14,304

Udio nabavke = 6.000 / 14.304 = 42%

Godišnji ekvivalent = 14.304 / 10,3797 = €1.378/god.

💡 Savjet: Za pumpe i motore, troškovi energije obično dominiraju LCC-om. Ulaganje u jedinicu veće efikasnosti s većom cijenom nabave često značajno smanjuje ukupan LCC.

Lifecycle Cost (LCC) is the total cost of owning and operating an asset over its entire useful life. It includes acquisition, installation, energy consumption, maintenance, downtime losses, and end-of-life disposal costs — all discounted to present value.

LCC analysis helps make better purchasing decisions by looking beyond the initial price tag.

The discount rate reflects the time value of money — a euro today is worth more than a euro in the future. It accounts for inflation, investment opportunity cost, and risk.

  • Higher discount rate — future costs weigh less, favoring low-operating-cost options less
  • Lower discount rate — future costs weigh more, making energy-efficient equipment more attractive
  • Typical range: 3–8% for industrial equipment

Purchase price is only the upfront acquisition cost. LCC includes all costs over the equipment's entire life:

  • Acquisition and installation
  • Energy consumption (often the largest component)
  • Maintenance and repairs
  • Downtime and production losses
  • Decommissioning and disposal

For pumps, the purchase price is typically only 5–15% of the total LCC.

The split varies by equipment type:

  • Industrial pumps: 5–15% acquisition, 85–95% operating
  • Electric motors: 1–5% acquisition, 95–99% operating
  • Compressors: 10–20% acquisition, 80–90% operating
  • HVAC systems: 15–25% acquisition, 75–85% operating

Energy costs dominate for most rotating equipment.

Key components:

  • Energy: Power (kW) × Annual hours × Price (€/kWh). For a 5 kW pump running 8,000 hr/yr at €0.12/kWh → €4,800/yr
  • Maintenance: 2–6% of acquisition cost per year, or use historical records
  • Downtime: Expected failures/yr × Hours per repair × Production loss per hour

Consult equipment datasheets for rated power and maintenance schedules.

Procedure opisane na ovoj stranici razvio je i terenski testirao tim Vibromera koristeći Balanset-1A, prenosivi dvokanalni balanser i analizator vibracija za balansiranje rotora na licu mjesta.

Vibromera — Prenosivo Balansiranje & Analiza Vibracija
Profesionalni instrumenti za polsko balansiranje rotora i softver. Smanjite troškove energije i produžite životni vijek opreme. Korišteno u 50+ zemalja.
Saznajte više o uređajima za balansiranje Vibromera

© 2024–2025 Vibromera — Inženjerskikalkulatori

Analiza troška životnog ciklusa s diskontovanjem NPV-a. Posljednja ažuriranja: februar 2025

Kategorije:

Nikolai Shelkovenko

Nikolai Shelkovenko

Nikolai Shelkovenko je inženjer analize vibracija te osnivač i izvršni direktor kompanije Vibromera. Više od 15 godina balansira rotacionu opremu na terenu, a ne na ispitnom stolu: malčere, industrijske ventilatore, drobilice, centrifuge, vratila i vretena. Upravo je iz tog rada nastala serija instrumenata Balanset — osmišljeni su kao alat koji stručnjak može ponijeti do mašine i njime raditi sam, na licu mjesta, a ne kao laboratorijska oprema. Vibromera je osnovana 2017. godine, a od 2023. sjedište joj je u Portu u Portugalu. Ovdje se odvijaju razvoj, sklapanje i podrška za liniju Balanset. Vodeći instrument je Balanset-1A, prijenosni analizator za balansiranje u jednoj i dvije ravni te za vibracijsku dijagnostiku. Nikolai lično učestvuje u podršci korisnicima, u rješavanju složenih slučajeva balansiranja i u razvoju softvera. Radi s korisnicima širom svijeta, na bilo kojem jeziku.